Dorm Construction - Before
George, faithful friend and great servant of God who has been building with me for almost 18 years.
Dorm Construction - Before
One of two sets of stairs from lower level to upper level.
Dorm Construction - After
Upstairs looking down on the lower level exit
Dorm Construction - Before
Downstairs area.
Dorm Construction - Before
Insulating lower level walls.
Dorm Construction - Before
#1 volunteer: George.
Dorm Construction - Before
Work in progress, all the steel walls (approx. 1000 studs) in basement are up and starting on door framing.
Dorm Construction - After
Downstairs area becomes Dorm rooms
Dorm Construction - After
Downstairs area becomes Dorm rooms - the entire length
Dorm Construction - Before
Some of the many feet of duct and plumbing in the building.
Dorm Construction - Before
1 of the 13 showers waiting to be set in building.
Dorm Construction - After
Each dorm room has its own shower and sink
Dorm Construction - After
Each dorm room has its own shower and sink
Dorm Construction - After
New Dorms call for new beds!
Dorm Construction - Before
Some of the parts waiting for install that make up the approximate 1500 feet of duct work in the building.
Dorm Construction - Before
2 of the 3- 200 amp electrical boxes that make up the 600 amp service.
Dorm Construction - Before
2 of the 15 pieces that make up the 28 tons of geothermal equipment.
Dorm Construction - After
One of the mechanical rooms - this is for the geothermal and boiler
Dorm Construction - After
One of the mechanical rooms - this is for the geothermal and boiler
Dorm Construction - Before
More ducting in the great room.
Dorm Construction - Before
Start of insulation in the Great Room.
Dorm Construction - Before
Great room facing serving line.
Dorm Construction - After
Great room facing serving line.
Dorm Construction - After
The kitchen lighting panel is taking shape!
Dorm Construction - Before
Great room facing fireplace.
Dorm Construction - After
Great room facing fireplace.
Dorm Construction - After
The fireplace in the great room
Dorm Construction - Before
Exit to the outside.
Dorm Construction - After
Exit to the outside.
Dorm Construction - After
From the exit looking toward the dorm room hallway entrance
Dorm Construction - Before
Front of new dorms. The Great Room is on the left.
Dorm Construction - After
Front of new dorms. The Great Room is on the left. Grass has taken root around the building
Dorm Construction - Before
The Great room gets siding.
Dorm Construction - Before
Hallway from Great room to Kitchen & bedrooms.
Dorm Construction - After
Hallway from Great room to Kitchen & bedrooms.
Dorm Construction - After
The concrete floor was etched and stained
Dorm Construction - After
The view out the upstairs dorm window
Dorm Construction - Before
The back of the building waits to be sided
Dorm Construction - Before
Deck waiting for Spring, floorboards and siding.
Dorm Construction - After
The siding and rear deck are completed
Dorm Construction - After
Deck is done!
Copyright 2002 E-mail:
spvalcmp@muscanet.com
Spring Valley Bible Camp Phone: (563) 263-6025